COMPLETED PROJECTS

 

JPNelson INVOLVEMENT IN SU TONG BRIDGE PROJECT, CHINA

PVE 200M supplied by JP Nelson Equipment has been deployed for the construction of the gigantic Su Tong cable-stayed bridge near Nantong city in China. This two time six lane highway will have two 430 m pylons and span 5,500 m.

PVE 200M, a top model will bring 130 casing with a diametre of 2,800mm and an overall length 65 m into the ground. The fixed X-plate comstruction combined with four clamps guarantees and optimum grio and transmission of the impact energy. The powerd is generated by PVE model 1600 power unit with a 1600 litre/min oil flow.