Blog

0
0
Blog

SINGAPORE - Circle Line Project

22 Jul 2021

The Circle Line (CCL), which is set to be in operation from 2010 onwards, will be Singapores fourth Mass Rapid Transit line. Costing $6.7 billion in value, the CCL will be a fully underground orbital line linking all radial lines leading to the city. The CCL spans a total of 33.3 km in length with 29 stations altogether.

Several of our reputable clients engaged for this project are Woh Hup, Shanghai Tunnel Engineering & Construction, Hock Lian Seng Infrastructure Pte Ltd and many more. In order to achieve the intended construction results, our clients had hired from us equipment such as Crawler

Cranes, Hydraulic Vibros, and Generators for their jobs. We are glad and appreciate the opportunity to have supplied our quality equipment to our clients for this major project.


Picture3

  • Will be built in three stages
    -Stage 1 to be completed in 2019
    -Stage 2 to be completed in 2020
    -Stage 3 to be completed in 2021
  • The whole line will be completely underground. A total of 22 stations and TSL will add greatly to the accessibility and connectivity of the current rail network, with interchanges to all other 5 MRT lines.
  • TSL estimated to be built at estimated S$18 billion.
Whatsapp
Outlook
LinkedIn
Facebook